X hits on this document

898 views

0 shares

0 downloads

0 comments

120 / 324

r

r

l

I 1.

L

Build Different. Build Better.

sM

5.

ICF manufactured product has been evaluated for compliance with the applicable model building code. Documentation of Building Officials Conference of America (BOCA) approval. Documentation of Uniform Building Code (UBC) approval. Documentation of Standard Building Code (SBC) approval. Documentation of International Building or Residential Code (IBC or IRC)

  • 6.

    Documentation offastener withdrawal from plastic tie insert flange strip.

  • 7.

    Letter from the proposed insulating concrete form system confirming that proposed insulating concrete form manufacturer has been producing this type of product in North America for a minimum of 5 years.

  • 8.

    Documentation of proposed insulating concrete form product used in buildings of comparable size and scope located in the United States.

  • 9.

    Documentation of fire rating design listings where applicable.

  • 10.

    Documentation of noncombustible construction approval where applicable.

B.

SUBMITTALS PRIOR TO CONTRACT AWARD:

1.

Proposed insulating concrete form mant,lfacturer to submit product warranty prior to

contract award.

.

  • C.

    SUBMITTALS PRIOR TO COMMENCEMENT OF ICF WORK:

    • 1.

      Designer's printed recommendations for the proper installation of mechanical and electrical component installations, penetrations, interior and exterior finishes, and attachment of structural elements.

    • 1.07

      QUALITY ASSURANCE

      • A.

        ACCEPTABLE PRODUCTS AND MANUFACTURER'S QUALI FICATIONS. A single manufacturer that has been successfully producing ICF products for not less than 5 years in North America.

  • B.

    AGENCY APPROVALS. The proposed insulating concrete form product shall have been evaluated to the applicable building code and shown to be in current compliance as evidenced by an evaluation report from one of the following code agencies.

    • 1.

      BOCA Evaluation Services, Inc.

    • 2.

      ICBO Evaluation Service, Inc.

    • 3.

      SBCCI Public Safety Testing and Evaluation Services Inc.

    • 4.

      National Evaluation Service, Inc.

      • S.

        ICC ES, Inc.

    • 6.

      Metro Dade Product Control Notice of Acceptance.

  • C.

    SCOPE OF WORK. The work to be performed under this specification shall include but is not limited to the following: Attend necessary job meetings and furnish competent and full time supervisor, labor, all materials, tools, and equipment necessary to complete, in an acceptable manner, the insulating concrete form system installation in accordance with this specification. Comply with the application guidelines of the manufacturer of the insulating concrete form products.

Issued on: 101112005 Release: G

3

Document info
Document views898
Page views898
Page last viewedFri Dec 09 19:42:43 UTC 2016
Pages324
Paragraphs11037
Words86316

Comments