X hits on this document

910 views

0 shares

0 downloads

0 comments

124 / 324

A.

Sheet waterproofing membrane material to be supplied under this section and installed according to manufacturer's recommendations as specified under Section 07 13 00 (Sheet Waterproofing).

B.

Waterproofing material to be compatible with EPS foam form units and display the following characteristics:

C.

Drainage board or waterproofing protection materials.

Drainage or protection board material to be installed adjacent to waterproofing installation and temporarily fixed or adhered in place prior to back-fill. Material supplied shall be as specified under Section 07 1300.

2.05

PARGING

A.

Exposed exterior wall surface from waterproofing to grade line shall be covered with a durable, weather resistant covering in accordance with code requirements or a specific research report. Stucco type material or equivalent supplied under this section and installed as specified under Section 0922 00 (Portland Cement Plaster).

r

i

(7

L

Build Different. Build Better.sM

2.04

WATERPROOFING

B.

Alternate acrylic finish supplied and installed under Section 07240 (EIFS Systems)

f'

2.06

ACCESSORIES

I L

A.

B.

Buck Materials

1.

Extruded vinyl or wood or metal

Ledge Form Reinforcement

buck material

L L

PART 3

EXECUTION

3.01

PREPARATION

A.

Remove all loose aggregate and foreign substances prior to commencement of insulating concrete form system installation.

3.02·

INSTALLATION OF FORM UNITS

A.

Installation of forms to be in accordance with manufacturer's installation guidelines as submitted in evidence under Sub Section 1.08 of this Section.

B.. The illstaller shall

t!le following accepted practices are utilized on site as outlined in

the manufacturer's installation guidelines.

Issued on: J0/112005 Release:G

7

Document info
Document views910
Page views910
Page last viewedSat Dec 10 06:53:24 UTC 2016
Pages324
Paragraphs11037
Words86316

Comments