12. Below grade waterproofing 13. Parging

3.03

SERVICE PENETRATIONS

A.

Service penetrations (electrical service conduits, water service pipes, and air supply and exhaust ducts, etc.) shall be placed at the required locations as indicated by the appropriate trades. Penetrations shall be reinforced as required by the structural engineer.

B.

Provide appropriate material such as PVC Schedule 40 pipe sleeves at service penetrations prior to placing concrete to create voids where services can be passed through at a later date.

3.04

ACCESSORY PRODUCT INSTALLATIONS

A.

Buck Materials

1. Buck Material. Refer to the manufacturer's guidelines for installation of appropriate bucking materials.

    • 3.05

      CLEANUP

      • A.

        Clean up and properly dispose of all debris remaining on job site related to the installation of the insulating concrete forms.

    • 3.06

      PROTECTION

      • A.

        Consult with exterior finish contractor concerning exposure to ultraviolet light to ensure proper finish to ICFwalis.

  • 1.

    Footing construction

  • 2.

    Wall layout

  • 3.

    Course placement

  • 4.

    Horizontal reinforcement placement

  • 5.

    Door and window opening construction

  • 6.

    Bracing, alignment and scaffolding

  • 7.

    Vertical reinforcement placement

  • 8.

    Lintel construction

  • 9.

    Service penetration planning and construction

  • 10.

    Concrete pre-placement checklist

  • 11.

    Concrete placement

    • a.

      Placement methods

    • b.

      Mix design

    • c.

      Concrete .consolidation

    • d.

      Post placement

Build Different. Build Better.

sM

ENO OF SECTION

Issued on: 101112005 Release: G