X hits on this document

765 views

0 shares

0 downloads

0 comments

165 / 324

Section 07210

Part 3 - EXECUTION

3.01 PREPARATION

    • A.

      The Contractor shall verify that the work ofother trades is complete to the point where this installation may properly commence, and that adjacent materials are dry and ready to receive the insulation.

    • B.

      The Contractor shall verify that mechanical and electrical services with wall are installed and tested before installing the insulation.

      • 3.02

        INSTALLATION

  • A.

    Install insulation after mechanical and electrical services within walls have been installed. Fit insulation tight within spaces and tight to and behind mechanical and electrical services. Leave no gaps or voids.

  • B.

    Install batt insulation with factory applied membrane facing warm side of building spaces. Lap ends and side flanges ofmembrane over framing members.

Tape seal butt ends and lapped side flanges and ends.

Do not tear or cut

,membrane

'

  • C.

    Install batt insulation in ceiling spaces. Support adequately utilizing wire lattice supported from framing members.

  • D.

    Install acoustical insulation tight to framing members. Install behind electrical and mechanical services. Provide continuous within spaces as required.

  • E.

    Apply rigid polystyrene insulation to vertical surfaces or perimeter foundation walls in accordance with manufactUrer's instructions. Use type of adhesive recommended. Adhere boards to foundation perimeter, horizontally. Place boards in a method to maximize contact bedding. Stagger joints. Butt edges and ends tight to adjacent boards and to protrusions.

END OF SECTION

Section 07210 2

(

, I ' , 1, ',.

Document info
Document views765
Page views765
Page last viewedMon Dec 05 14:59:02 UTC 2016
Pages324
Paragraphs11037
Words86316

Comments