Section 01001

    • 1.7

      COORDINATION

      • A.

        Coordinate scheduling, submittals, and Work ofthe various sections of specifications to ensure efficient and orderly sequence of installation of interdependent construction elements.

      • B.

        Verify utility requirement characteristics of operating equipment are compatible with building utilities.

      • C.

        Coordinate space requirements and installation of mechanical and electrical work, which are indicated diagrammatically on Drawings. Follow routing shown for pipes, ducts and conduit as closely as practicable.

      • D.

        In finish areas, conceal pipes, ducts and wiring within the construetion.

    • 1.8

      FIELD ENGINEERING

      • A.

        The Contractor will employ a Registered Surveyor to locate a reference datum and protect survey control and reference points.

      • B.

        Establish elevations, lines, and levels and certify that elevations and locations of the Work conform to the Contract Documents.

    • 1.9

      PRECONSTRUCTION

      • A.

        Architect will schedule a preconstruction meeting after Date of Owner Contractor Agreement for all affected parties.

      • B.

        When required in individual specification section, convene a preinstallation meeting at Project site prior to commencing work on the section.

    • 1.10

      PROGRESS MEETINGS

      • A.

        The Architect will schedule and administer meetings throughout progress of the Work at maximum weekly intervals.

      • B.

        The Contractor will preside at meetings, record minutes, and distribute copies within three days to those affected by decisions made.

    • 1.11

      EXAMINATION

      • A.

        Verify that existing site conditions and substrate surfaces are acceptable for subsequent Work. Beginning new Work means acceptance of existing conditions.

      • B.

        Verify that utility services are available, of the correct characteristics, and in the correct location.

L12

CUTTING AND PATCHING

  • A.

    Employ a skilled and experienced installer to perform cutting and patching new work; restore Work with new Products.

  • B.

    Submit written request in advance of cutting or altering structural or building enclosure elements.

  • C.

    Execute cutting, fitting and patching to complete Work, and to:

    • 1.

      Fit the several parts together, to integrate with other Work.

    • 2.

      Uncover Work to install or correct ill-timed Work.

    • 3.

      Remove and replace defective and non-conforming Work.

    • 4.

      Remove samples of installed Work for testing.