X hits on this document

1510 views

0 shares

0 downloads

0 comments

182 / 324

Section 07620

SHEET METAL FLASHING

Part 1- GENERAL

    • 1.01

      SCOPE OF WORK

      • A.

        The Contractor shall provide all labor, materials, tools and equipment required to furnish and install two piece metal flashing perimeters of all modified bitumen roofed areas, as described in this section and as shown on the Contract Drawings.

    • 1.02

      SUBMITTALS

      • A.

        The Contractor shall provide descriptive submittals in accordance with the provisions of Section 01001 ofthese Specifications. Submittals include, but are not limited to, the following:

        • 1.

          Provide sample and rooflayout.

        • 2.

          Manufacturers recommended method ofinstallation.

Part 2 -PRODUCTS

    • 2.01

      MATERIALS

      • A.

        Fry Reglet Springlock Flashing Systems, Style STX with STX reglet, 24 gauge galvanized steel, standard zinc finish.

      • B.

        Prefabricated internal and external corners as manufactured by Fry Reglet.

Part 3 - EXECUTION

    • 3.01

      INSTALLATION

      • A.

        Install complete with required hardware, in strict accordance with manufacturers specifications. Lap minimum 4" over BRAI counter flashing.

    • 3.02

      CLEAN UP

      • A.

        Replace damaged units. Clean to original delivery finish.

END OF SECTION

1 Section 07620

Document info
Document views1510
Page views1510
Page last viewedSun Jan 22 06:26:45 UTC 2017
Pages324
Paragraphs11037
Words86316

Comments