D. Pre-installation Meetings: Conduct preinstallation meeting to verify project requirements, substrate conditions, manufacturer's installation instructions, and manufacturer's warranty requirements.

    • 1.06

      DELIVERY, STORAGE and HANDLING

      • A.

        General: comply with manufacturer's ordering instructions and lead-time requirements to avoid construction delays.

  • B.

    Delivery: Deliver materials in manufacturer's original, unopened, undamaged containers with identification labels intact.

    • 1.

      Handle and store products according to Therma-Tru recommendations published in technical materials. Leave product wrapped or otherwise protected and under clean dry storage conditions until required.

  • C.

    Storage and Protection: Store materials protected from exposure to harmful weather conditions, at temperature and humidity conditions recommended by the manufacturer.

    • 1.

      Pre-Hung Door/frame assemblies: Pre-hung Units shall be stored in an upright position under cover on building site on wood sills or floor in a manner that will prevent rust and damage. Remove plastic wrap packaging as required from packaged Pre-hungs as necessitated by high humidity conditions. Avoid creating a humidity chamber by using a plastic or canvas shelter and not venting the area covered.

    • 2.

      Door Storage: Units shall be stored in an upright position under cover on building site on wood sills or floor in a manner that will prevent rust and damage. Remove plastic wrap packaging as required from packaged doors as necessitated by high humidity conditions. Avoid creating a humidity chamber by using a plastic or canvas shelter and not venting the area covered. Doors shall be protected at corners to prevent damage or marring to finish.

    • 3.

      Frame Storage: Frame Units shall be stored under cover on building site on wood sills or floor in a manner that will prevent rust and damage. Remove plastic wrap packaging as required from packaged Pre-hungs as necessitated by high humidity conditions. Avoid creating a humidity chamber by using a plastic or canvas shelter and not venting the area covered.

    • 1.07

      PROJECT CONDITIONS

      • A.

        Field measurements: Verify actual measurements/openings by field measurements before fabrication: show recorded measurements on shop drawings. Coordinate field measurements and fabrication schedule with construction progress to avoid construction delays.