Section 01001

necessary to do document confonnity with the design intent.

    • C.

      Mark each copy to identifY applicable products, models, options, and other data. Supplement manufacturers' standard data to provide infonnation unique to this project.

      • 1.16

        SAMPLES

        • A.

          Submit samples to illustrate functional and aesthetic characteristics of the Product.

        • B.

          Submit three (3) samples of finishcs from the full range of manufacturers' standard colors or in custom colors as selected, textures, and patterns for Architect/ Engineer's selection.

    • 1.17

      CONSTRUCTION PROGRESS SCHEDULES

      • A.

        Submit initial progress schedule in duplicate within 15 days after date of Owner Contractor Agreement for Architect review.

      • B.

        Submit, revised schedules with each Application for Payment, identifYing changes since previous version. Indicate estimated percentage of completion for each item of Work at each submission.

      • C.

        Submit a horizontal bar chaI1 with separate line for each section of Work, identifYing first workday of each week.

    • 1.18

      MANUFACTURER INSTALLATION INSTRUCTIONS

      • A.

        When specified in individual specification sections, submit manufacturer printed instlUctions for delivery, storage, asscmbly, installation, staI1-up, adjusting, and finishing in quantities specified for Product Data.

    • 1.19

      MANUFACTURER CERTIFICATES

      • A.

        When specified in individual specification sections, submit celiification by manufacturer to Architect/Engineer, in quantities specified for Product Data.

      • B.

        Indicate material or Product conforms to or exceeds specified requirements. Submit supporting reference data, affidavits, and certifications as appropriate.

    • 1.20

      QUALITY ASSURANCE - CONTROL OF INSTALLATION

      • A.

        Monitor quality control over suppliers, manufacturers, Products, services, site conditions, and workmanship, to produce Work of specified quality.

      • B.

        Comply with manufacturers' instlUctions.

      • C.

        Comply with specified standards as minimum quality for the Work except when more stringent tolerances, codes, or specificd requirements indicate higher standards or more prccise workmanship.

    • 1.21

      TOLERANCES

      • A.

        Monitor tolcrance control ofinstalled Products over suppliers, manufacturers, Product, sitc conditions, and workmanship, to produce acccptable Work. Do not pennit tolerances to accumulate.

      • B.

        Comply fully with manufacturers' tolerances.