Section 08710

FINISH HARDWARE

Part 1 - GENERAL

    • 1.01

      SCOPE OF WORK

      • A.

        The Contractor shall provide all labor, materials, tools and equipment required to furnish and install finish hardware for all interior and exterior doors, except those described in Section 08400: Entrance Doors, as described in this section and as shown on the Contract Drawings.

    • 1.02

      SUBMITTALS

      • A.

        The Contractor shall provide descriptive submittals in accordance with the provisions of Section 01001 of these Specifications. Submittals include, but are not limited to, the following:

        • 1.

          Hardware Schedule: Within 10 days after receipt of a contract for the finish hardware, prepare a complete schedule and submit 8 copies of the hardware schedule with 3 copies of catalog cuts, highlighted to show each different hardware item, to the Architect for review. Do not order hardware until a corrected copy of the schedule is returned to the supplier bearing the approval of the Architect.

        • 2.

          This schedule shall indicate the following details: door numbers, location, size and thickness of door, door material, frame materials, hand of door, degree of opening and type of attachment.

        • 3.

          Templates: After receipt of the approved corrected hardware schedule, upon request the hardware supplier shall send 4 sets of all templates and con'ected hardware schedule to the general contractor for distribution to the wood door, metal door and from manufacturers/suppliers.

        • 4.

          Maintenance Manuals: Furnish 3 copies of maintenance manuals covering the finish hardware for this project. Each manual shall consist ofprinted sheets from the hardware manufacturer bound in a 3-ring binder and properly indexed.

Include the following information in the maintenance manuals:

    • a.

      Address and telephone number of the hardware supplier.

    • b.

      Address and telephone number of each hardware manufacturer.

    • c.

      Maintenance instructions and parts list for each type of operating hardware, including: locks, exit devices and closers.

    • d.

      Warranty for closures and all other hardware.

      • 1.03

        QUALITY ASSURANCE

A. Supplier Qualifications: The hardware supplier must have in hislher employment an Architectural Hardware Consultant with a minimum of 10 years of Architectural Hardware experience, who shall be responsible for the detailing, scheduling and ordering of the finish hardware for this Contract.

Section 08710 1