Section 08710

    • 3.03

      ADJUST AND CLEAN

      • A.

        Adjust and check each operating item ofhardware and each door to ensure proper operating function of every unit. Replace units, which cannot be adjusted to operate freely and smoothly as intended for the application made.

      • B.

        Final Adjustment: Whenever hardware installation is made more than one month prior to acceptance or occupancy of a space or areas, return to the work during the week prior to acceptance or occupancy and make final check and adjustment of all hardware items in such space or area. Clean operating items as necessary to restore proper function and finish of hardware and doors. Adjust door control devices to compensate for final operation of heating and ventilating equipment.

      • C.

        Instruct Owners personnel in proper adjustment and maintenance of hardware and hardware finishes during the final adjustment of hardware.

    • 3.04

      HARDWARE SCHEDULE

      • A.

        Acceptable Hardware manufacturers include but are not limited to: Yale YH Series Grade 2 Levers

Yale YH Series Grade 2 Deadbolt Series 83 Yale YME 1000 Grade 1 Exit Devices Yale YMDC 2000 Door Closures Hager Hinges Ives 1800 Viewers Ives 061 Floor Stops Ives #70 Hinge Stops Ives #347 Adjustable Ball Catches

  • B.

    All Hardware Finishes to be Brushed Chrome or Similar Finish.

  • C.

    See Door Schedule for required new hardware.

END OF SECTION