more than areas of of 100 ft2 (9.30 m2) for all horizontal applications. The distance between jOints shall not exceed 18 ft

      • (5.5

        m) in either direction or a length-to-width ratio of 2V2 to 1".

    • 3.

      Location and frequency of control joints to be detailed by the design professional and shown on drawings when applicable.

    • 1.03

      SUBMITTALS

A.

General: Applicator to submit:

  • 1.

    Manufacturer's technical information including installation instructions and recommendations.

  • 2.

    Samples: Submit samples for approval. Samples shall be of materials specified and of suitable size as required to accurately represent each color and texture to be used on project. Prepare each sample using same tools and techniques for actual project application. Approved samples shall be maintained and available job site.

at

1.04

QUALITY ASSURANCE

A.

Requirements of Regulatory Agencies: to comply with all applicable codes and of local agencies having jurisdiction.

Install stucco basecoat assembly standards and with requirements

  • B.

    Manufacturer: Shall have marketed stucco products in United States for at least ten years; shall have completed projects of same building size and type as this project.

  • C.

    Applicator Qualifications: Applicators specializing in the installation of exterior stucco assembly with a minimum of 5 years experience in work similar to that required by this section.

D.

Single Source Responsibility: All stucco base coat and finish materials shall be from a single manufacturing source.

1.05

PRODUCT DELIVERY, STORAGE, AI\ID HANDLING

A.

Deliver manufactured manufacturer's labels

materials in original intact and legible.

packages

or containers,

with

B.

Keep materials dry, above freezing, stored off ground, under cover, and away from damp surfaces. At the time they are mixed, all materials shall be at a minimum temperature of 400 F (40 C).

    • C.

      Remove wet, frozen, damaged, or detrimental materials from site immediately.

      • 1.06

        PROJECT SITE AND INSTALLATIOI'J CONDITIOI'JS