Section 01001

    • B.

      Erect on site at location established by Architect.

      • 1.45

        FIELD OFFICES AND SHEDS

        • A.

          Office: Weather tight, with lighting, electrical outlets, heating, cooling and ventilating equipment, and equipped with sturdy furniture and drawing display table.

        • B.

          Provide space for Project meetings.

    • 1.46

      REMOVAL OF UTILITIES, FACILITIES AND CONTROLS

      • A.

        Remove temporary utilities, equipment, facilities, and materials, prior to Substantial Completion review.

      • B.

        Clean and repair damage caused by installation or use of temporary work.

    • 1.47

      PRODUCTS

      • A.

        Products: Means new material, machinery, components, equipment, fixtures, and systems forming the Work, but does not include machinelY and equipment used for preparation, fabrication, conveying and erection of the Work.

      • B.

        Provide interchangeable components of the same manufacture for components being replaced.

    • 1.48

      TRANSPORTATION, HANDLING, STORAGE AND PROTECTION

      • A.

        Transport, handle, store and protect Products in accordance with manufacturer's instructions.

      • B.

        Protection: Use all means necessary to protect the products of this section before, during and after installation and to protect the installed work and materials of all other trades.

      • C.

        Replacements: In the event of damage, immediately make all repairs and replacements necessary to the approval ofthe Architect and at no additional cost to the Owner.

    • 1.49

      PRODUCT OPTIONS

      • A.

        Products Specified by Reference Standards or by Description Only: Any Product meeting those standards or description.

      • B.

        Products Specified by Naming One or More Manufacturers with a Provision for Substitutions: Submit a request for substitution for any manufacturer not named.

    • 1.50

      SUBSTITUTIONS

      • A.

        ArchitectlEngineer will consider requests for substitutions only within 30 days after date of Owner-Contractor Agreement.

      • B.

        Substitutions will be considered when a Product becomes unavailable through no fault of the Contractor.

      • C.

        Document each request with complete data substantiating compliance of proposed Substitution with Contract Document.

      • D.

        Submit three copies of request for Substitution for consideration. Limit each request to one proposed Substitution.