Section 09310

CERAMIC TILE

Part 1 - GENERAL

    • 1.01

      SCOPE OF WORK

      • A.

        The Contractor shall provide all labor, materials, tools and equipment required to furnish and install ceramic tile, as described in this section and as shown on the Contract Drawings.

        • 1.

          Ceramic floor tile using Portland cement mortar over concrete subfloor with commercial POltland cement.

        • 2.

          Ceramic wall tile and cove base using Dry-Set mortar over gypsum board with Dry-Set grouted joints.

    • 1.02

      SUBMITTALS

      • A.

        The Contractor shall provide descriptive submittals in accordance with the provisions of Section 01001 ofthese Specifications. Submittals include, but are not limited to, the following:

        • 1.

          Catalog data describing tile and grout materials and their confonnance to applicable standards, including standard colors available.

        • 2.

          Two tile samples each of the selected colors of the ceramic tile.

        • 3.

          Manufacturers recommended installation procedures.

    • 1.03

      PRODUCT HANDLING

      • A.

        Deliver all products to job site in manufacturers unopened containers with grade seals unbroken and labels intact.

      • B.

        Keep tile cartons dry.

    • 1.04

      ENVIRONMENTAL CONDITIONS

      • A.

        Maintain temperature at 50 degrees F minimum during tilework and for 7 days after completion.

      • B.

        Vent temporary heaters to outside to avoid carbon dioxide damage to new tilework.

    • 1.05

      EXTRA STOCK

      • A.

        Supply extra 2% of each tile used in clean marked cmtons for Owners emergency use.

Section 09310 1