Section 01001

    • 1.51

      STARTING SYSTEM

      • A.

        Provide seven days notification prior to start-up of each item.

      • B.

        Ensure that each piece of equipment or system is ready for operation.

      • C.

        Execute start-up under supervision of responsible persons in accordance with manufacturer's instructions.

      • D.

        Submit a written report that equipment or system has been properly installed and is functioning correctly.

1.52

DEMONSTRATION AND INSTRUCTIONS.

A.

R

C.

Demonstrate operation and maintenance of Products to Owner's personnel two weeks prior to date of final review. A second demonstration shall be held two weeks after the first one. For equipment or systems requiring seasonal operation, perfOlm demonstration for other season within six months. Demonstrate start-up, operation, control, adjustment, trouble-shooting, servicing, maintenance, and shutdown of each item ofequipment at agreed-upon times, at equipment location.

    • 1.53

      TESTING, ADJUSTING AND BALANCING.

      • A.

        Owner will appoint and employ services of an independent firm to perform testing, adjusting, and balancing as indicated in the Specifications.

      • B.

        Reports will be submitted by the independent firm to the Architect/Engineer indicating observations and results of tests and indicating compliance or non compliance with specified requirements and with the requirements of the Contract Documents.

      • C.

        Cooperate with independent finn; fumish assistance as requested.

      • D.

        Re-testing requirement because of non-conformance to specified requirements will be charged to the Contractor.

    • 1.54

      CONTRACT CLOSEOUT PROCEDURES

      • A.

        Submit written certification that Contract Documents have been reviewed, Work has been inspected, and that Work is complete in accordance with Contract Documents and ready for Architect inspcction.

      • B.

        Submit final Application for Payment identifying total adjusted Contract Sum/Price, previous payments, and amount remaining due.

    • 1.55

      FINAL CLEANING

      • A.

        Execute final cleaning prior to final inspection.

      • B.

        Clean interior and exterior surfaces exposed to view. Vacuum carpeted and soft surfaces.

      • C.

        Clean debris from site, roofs, gutters, downspouts, and drainage systems.

      • D.

        Replace filters ofoperating equipment. Remove waste and surplus materials, rubbish and constructions facilities from the site.