Section 09900

PAINTING

Part 1 - GENERAL

    • 1.01

      SCOPE OF WORK

      • A.

        The Contractor shall provide all labor, materials, tools and equipment required to furnish and apply all paint, as described in this section and as shown on the Contract Drawings.

      • B.

        The term "paint" includes emulsions, enamels, paints, sealers and other coatings whether used as prime, intelmediate or finish coats.

    • 1.02

      SYSTEM DESCRIPTION

      • A.

        Finish Materials: Confonn to applicable code for flame/smoke rating requirements.

    • 1.03

      SUBMITTALS

      • A.

        The Contractor shall provide descriptive submittals in accordance with the provisions of Section 01001 of these Specifications. Submittals include, but are not limited to, the following:

        • 1.

          Two samples of each color of all paint and coating products.

        • 2.

          Catalog data on all paint products including manufacturers name, paint designation and conformance with applicable Federal Specifications.

    • 1.04

      ENVIRONMENTAL REQUIREMENTS

      • A.

        Store and apply materials in environmental conditions required by manufacturers instructions.

      • B.

        Do not apply finishes unless moisture content of surface or sun-ounding area is above 45 degrees F. Provide minimum 25-foot candles oflighting on surfaces to be finished.

Part 2 PRODUCTS

    • 2.01

      PRODUCT DELIVERY

      • A.

        Deliver paints in sealed containers that legibly show the designated name, fonnula or specification number, batch number, color, quantity, manufactures name, date of manufacture, manufacturers formulation number, manufacturers directions including any warning and special precautions.