X hits on this document

1039 views

0 shares

0 downloads

0 comments

256 / 324

Section 12370

Part 3 - EXECUTION

    • 3.1

      EXAMINATION AND PREPARATION

      • A.

        Verify adequacy ofbacking and location of mechanical and electrical outlets.

    • B.

      Provide supplementary support framing.

      • 3.2

        INSTALLATION

        • A.

          Set and secure casework in place rigid, plumb, and level.

        • B.

          Provide neat cutouts for plumbing fixtures, appliances, and other fixtures

and fittings.

  • C.

    Use fixture attachments at concealed locations for wall mounted components.

  • D.

    Use concealed joint fasteners to align and secure adjoining cabinet units, counter tops, etc.

Carefully scribe casework which is against other building materials, leaving gaps of] /32 inch maximum. Use filler strips not additional overlay him for this purpose.

  • F.

    Secure cabinets and counter bases to floor using appropriate anchorage.

  • G.

    Adjust moving or operating parts to function smoothly and correctly.

OF SECTION

2 Section12370

Document info
Document views1039
Page views1039
Page last viewedTue Jan 17 05:04:31 UTC 2017
Pages324
Paragraphs11037
Words86316

Comments