X hits on this document

933 views

0 shares

0 downloads

0 comments

278 / 324

Tract A ofthe Villa Alegre Development

15.0 CLOSURE

This report was prepared recommendations presented in this

for

the

exclusive

use

of

our

Client.

The

report are based upon the subsurface conditions

disclosed

by the test

holes and

with time.

holes.

Soil

and

groundwater

conditions

may

vary

between

test

This report reflects our interpretation of the site subsurface conditions. We strongly recommend that prior to bidding all contractors perform their own subsurface investigation to form their own opinion of the site soil, rock, and groundwater conditions. Should contractors elect to use this report for construction, bidding or estimating purposes, they do so at their own risk.

In a southwest climate it is particularly important to protect the soils supporting the proposed structure from an increase in moisture content. If soils supporting the structure increase in moisture content due to any cause such as poor site drainage, ponding areas, or leaking utility lines, significant structural settlement and distress may occur.

If conditions are encountered during construction Which differ from those presented herein, this office should be contacted for supplemental recommendations.

The staff of Vinyard & Associates, as necessary,

is available for supplemental consultation

V

A Project No.: 09-J-JOJ

18

Document info
Document views933
Page views933
Page last viewedSat Dec 10 22:56:46 UTC 2016
Pages324
Paragraphs11037
Words86316

Comments