Tract B ofthe Villa Alegre Development

density as determined by ASTM D-1557. All fill below structures should be placed and compacted as detailed in the attached Appendix. Prior to pouring concrete footing excavations should be cleaned of any slough, loose soil, or debris. Footing excavations should be compacted as detailed in the attached Appendix.

Foundations designed and constructed as described herein are not anticipated

to

settle

more

than

one

inch.

Differential

settlement

between

adjacent

column

footings should not exceed one-half of the above value. estimates are based on the assumption the site soils will not

The above settlement be allowed to increase

in moisture content and that the site grading, drainage, earthwork, and recommendations presented in this report will be fully implemented.

landscaping

The site soils are slightly collapsible if allowed to increase in moisture content. If the soils supporting footings are allowed to increase in moisture content, additional settlement of 14 inch per foot of wetted soil could occur.

Foundations should be designed and constructed to tolerate the above settlement. Foundations should be designed by a qualified structural engineer.

To reduce the affect of settlement on the structure, we suggest that all stucco be fiberglass reinforced. Periodic control joints should be utilized in the stucco particularly at window and door comers. Periodic control joints should also be utili7£d in masonry walls.

V &A Project No.: 09-1-102

7