X hits on this document

685 views

0 shares

0 downloads

0 comments

312 / 324

v

A

Tract B ofthe Villa Alegre Development

15.0 CLOSURE

This report was prepared recommendations presented in this

for

the

exclusive

use

of

our

Client.

The

report are based upon the subsurface conditions

disclosed by the test holes and with time.

holes.

Soil

and

groundwater

conditions

may

vary

between

test

This report reflects our interpretation of the site subsurface conditions. We strongly recommend that prior to bidding all contractors perform their own subsurface investigation to form their own opinion of the site soil, rock, and groundwater conditions. Should contractors elect to use this report for construction, bidding or estimating purposes, they do so at their own risk.

In a southwest climate it is particularly important to protect the soils supporting the proposed structure from an increase in moisture content. If soils supporting the structure increase in moisture content due to any cause such as poor site drainage, ponding areas, or leaking utility lines, significant structural settlement and distress may occur.

If conditions are encountered during construction which differ from those presented herein, this office should be contacted for supplemental recommendations. The staff of Vin.yard & Associates, In.c. is available for supplemental consultation as necessary.

V & A Project No.: 09-1-102

18

Document info
Document views685
Page views685
Page last viewedSat Dec 03 03:15:39 UTC 2016
Pages324
Paragraphs11037
Words86316

Comments