Villa Alegre - Tract A

August 17, 2009

GRASS SODDING SECTION 02940

PART 1- GENERAL

    • 1.01

      DESCRlPTION

      • A.

        Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division-l Specification sections, apply to work of this section.

  • B.

    Related Work Specified Elsewhere:

    • 1.

      Section 02810: Underground Irrigation System

    • 2.

      Section 02945: Native Grass Seeding

    • 3.

      Section 02950: Trees, Shrubs, and Groundcovers

  • C.

    Description of Work: Prepare all areas indicated on the Drawings for grass sodding according to the specifications and drawings Contract Documents, including: furnishing and installing all sod, fertilizer, soil amendments and related maintenance.

    • 1.02

      QUALITY ASSURANCE

      • A.

        Contractor Qualifications: All work specified herein shall be performed by a licensed landscape contractor experienced with the type and scale of work required and having equipment and personnel adequate to perform the work satisfactorily.

  • B.

    Reference Standards: American Sod Producers Association Inc. (ASPA) Publication: Guideline Specifications for Sodding (updated).

    • 1.03

      SUBMITTALS

A. Product Data:

1

2

Submit name of sod supplier for approval by the Landscape Architect prior to ordering sod. Submit name of soil amendment material, compost and fertilizer, and sample of material for review and approval by Landscape Architect prior to ordering materials for soil amendment.

    • 1.04

      PRODUCT DELIVERY, STORAGE AND HANDLING

      • A.

        Delivery of Material: Time delivery so that sod will be placed within 48 hours after stripping. Protect sod against drying and breaking of soil strips.