Year(s) Project Duration Project Status Name of Client Name of Project

Cost of Project

: 1992 - 1993 : 1 Year : Complete : SWCC/Hyundai Engr. & Const. Co. : 1. Construction of Circular Con’c Water Tank. 2. Asphalt Road Paving : SR 10,200,000.00

Project Description : Construction of pre stressed con’c water tank of 8000m3 x 2 nos. & 6000m3 x 2 nos., road const. and asphalt paving work incl. curbstone and Sidewalks.

Year(s) Project Duration Project Status Name of Client Name of Project Cost of Project

: 1991 - 1994 : 3 Years : Complete : Saline Water Conversion Corporation. : Construction of RC Reservoirs at DUBA and HAQAL. : SR 1,900,000.00

Project Description : Construction of RC reservoirs at Duba and HAQAL.

Year(s) Project Duration Project Status Name of Client Name of Project

Cost of Project

: 1994 - 1996 : 18 Months : Complete : Electricity Corporation. : Tabuk II Power Plant Expansion Projects with MEEDCO (Hyundai) : SR 9,000,000.00

Project Description : 1. Construction of turbine (g.e.) and all other indoor & out door equipments foundations including. Transformer foundation and fire wall.

  • 2.

    Soil improvement works.

  • 3.

    Design and const. of turbine and interface bldg.

foundation Including. pedestalas with anchor bolts embedded for steel building columns.

  • 4.

    Erection of steel building. structures and cladding panels. (supplied by IBSF)

  • 5.

    Extension of substation # 5 (construction of complete building. for extended part)

  • 6.

    Construction of pipe trenches and cable ducts including. manholes

and hand holes. 7. Construction of oil storage tank foundation.

Saudi Al Terais Co. - STICCO