X hits on this document

151 views

0 shares

0 downloads

0 comments

40 / 46

RISK MANAGEMENT WORKSHEET

A.  Mission or Task

D.  Prepared By:  (Rank, Last Name, Duty Position)

B.  Date/Time Group

     Begin:

     End:

C.  Date Prepared:

LOW (L)          MODERATE  (M)         HIGH (H)        EXTREMELY HIGH  (E)

K.  Overall risk level after controls are implemented (circle one)

E.  Task

F. Identify

   Hazards

G. Assess

   Hazards

H. Develop Controls

I. Residual

   Risk

J. Implement Controls

(“How To”)

NTC FTX Foot March

0600

0900

22 Apr XX

Tanker, Stud

Foot

March

Foot

March

Foot

March

Heat

(90+)

Cross

Hwy

New

Troops

P = F

S = C

R = E

P = O

S = C

R = H

P = F

S = M

R = H

-Force hydration

before, during &

after foot march

-Use road guards

or MPs

-Ensure training

-Spread NCOs

in formation

-Unit

TACSOP

-Verbal

-Unit

SOP

-Unit

TACSOP

P = F

S = M

R = H

P = O

S = N

R = L

P = F

S = N

R = M

Document info
Document views151
Page views150
Page last viewedWed Jan 18 00:14:39 UTC 2017
Pages46
Paragraphs732
Words2667

Comments