Umbilicals and telecom / power cables (Continued)

ABB AB (Karlskrona, Sweden) 2007, present

  • Installation of BritNed Interconnector between The Netherlands and United Kingdom.

  • Acting in the capacity of the Main Contractor’s Engineer.

  • Contractual support for main contractor

  • Interface management

  • Risk mitigation [contractual & operational]

  • Market approach for pre-construction survey

  • Conceptual design of pipeline crossings

  • Protective Burial study of cable through sand waves

  • Design of cable corridor through sand waves

  • Future scope:

    • Subcontract management of dredging work, incl. rock dumping

    • Subcontract management of trenching work Involvement in laying