X hits on this document

33 views

0 shares

0 downloads

0 comments

2 / 11

Platform installation and loading installations

SERVICES

  • Heavy lift (crane selection and rigging design);

  • Suction pile installation;

  • SPM installation (mooring leg installation, hook up mooring legs to buoy, submarine hose installation).

CLIENTS

SMIT Heavy Lift B.V. (Rotterdam, The Netherlands)

  • Contractual support for various SPM installation related proposals;

  • Providing technical support for the Kizomba A Boatlanding Installation Project.

S u c t i o n P i l e T e c h n o l o g y B . V . ( W o e r d e n , T h e N e t h e r l a n d s ) Contractual support for various proposals; Evaluation of proposals and technical / commercial risk evaluation; Developing installation procedures for the Bucket Foundation North Nemba Flare platform.

Statoil SA (Oslo, Norway)

  • Representing Statoil onboard D.P. Fall Pipe Vessel “Sandpiper” during the construction of rockdump foundation for temporary wet storage of Template for the Tordis & Vigdis flowlines [Snorre Export lines].

© 1997-2008 Primo Marine - All rights reserved

Document info
Document views33
Page views33
Page last viewedThu Dec 08 18:29:05 UTC 2016
Pages11
Paragraphs243
Words1403

Comments