Umbilicals and telecom / power cables

SERVICES

  • Cable installation procedures;

  • Cable installation analyses

tension levels;

  • Cable repair procedures.

CLIENTS

Statnett SF and TenneT NV, (Oslo - Norway, Arnhem - The Netherlands) 2005, 2006, 2007

  • Installation of NorNed HVDC Cable Installation Project between The Netherlands and Norway. Acting in the capacity of the Owner’s Engineer.

  • Appraisal of Contractor [JV Bohlen & Doyen and Tideway] provided engineering and operational procedures in general and for trenching, dredging and rockdumping operations in particular.

  • Representing Company during following campaigns: Pre-lay Surveys of complete cable route. Dredging of Navigational channels for Cable Lay Vessel Skagerrak. Shallow Water trenching operations in environmentally sensitive Waddenzee. Deep Water trenching operations outside Waddenzee. Pre-lay rockdumping of pipeline crossings Total Primo Marine team comprises 7 discipline engineers to cover the above operations. Work also involves presentation of the Operational Methodology to Insurance Company.