X hits on this document

29 views

0 shares

0 downloads

0 comments

7 / 10

OK

COMMENT

OK

COMMENT

OK

COMMENT

TRB Transportation Research E-Circular E-C013

WALKAROUND INSPECTION (proceed around the unit in a clockwise direction): Lights: 4 ways, head, turn, tail: Strobes, beacons, or sign board: Transmission and axles: Tires: front and rear: Axle locks (front/rear): Axle lock switches (front/rear): Hydraulic pump and hoses: Electrical switches and cables: Air hoses, outlets: Body boxes: Ladders and rails: Chassis suspension (front/rear): Counterweights and switches:

AIR COMPRESSOR: Operational test: Air system hoses and valves: Electrical switches and cables: Gauges:

GENERATOR: Operational test: Electrical wires and connections: Circuit breakers and outlets: Instrument panel and meters:

HYDRAULIC TANK AND OIL COOLER: Oil level and gauge: Filter and gauge: Structure: Hydraulic hoses: Electrical switches and cables:

OK

COMMENT

88

AUXILIARY ENGINE: Fuel filter, oil level, and oil press: Coolant: Switches, wires, connections: Hydraulic pump and hoses:

OK

COMMENT

Hour meter:

  • Preheat and start auxiliary engine. Listen for unusual noises, and check engine

oil pressure, charging rate.

  • Shut down auxiliary engine: auxiliary engine will be started again during the

operations check.

Document info
Document views29
Page views29
Page last viewedThu Dec 08 14:41:58 UTC 2016
Pages10
Paragraphs256
Words2569

Comments