Chapter 7 Cast-In-Place Concrete

NCSBC-TABLE REQUIRED VERIFICATION AND INSPECTIO

1704.4 N OF CONCRETE CONSTRUCTION

REFERENCED

VERIFICATION AND INSPECTION 1. Inspection of reinforcing steel, including prestressing tendons, and placement.

CONTINUOUS PERIODIC

  • X

STANDARDa

ACI 318: 3.5, 7.1-7.7

X

X

X

X

2. Inspection of reinforcing steel welding in accordance with Table 1704.3, Item 5B. 3. Inspect bolts to be installed in concrete prior to and during placement of concrete where allowable loads have been increased.

  • 4.

    Verifying use of required design mix.

  • 5.

    Sampling fresh concrete and performing

slump, air content and determining the temperature of fresh concrete at the time of making specimens for strength tests. 6. Inspection of concrete and shotcrete placement for proper application techniques.

ACI 318: Ch. 4, 5.2-5.4 ASTM C 172 ASTM C 31 ACI 318: 5.6, 5.8 ACI 318: 5.9, 5.10

AWS D1.4

ACI 318: 3.5.2

7. Inspection for maintenance of specified curing temperature and techniques.

X

ACI 318: 5.11-5.13

NCSBC REFERENCE

    • 1903.5

      ,

    • 1907.1

      ,1907.7

1914.4 1903.5.2

1912.5

1904,

    • 1905.2

      -1905.4

    • 1914.2

      ,1914.3

    • 1905.6

      ,

1914.10

    • 1905.9

      ,

    • 1905.10

      ,

    • 1914.6

      ,1914.7

1914.8

    • 1905.11

      ,

    • 1905.13

      ,

1914.9

8. Inspection of prestressed concrete: a. Application of prestressing forces. b. Grouting of bonded prestressing tendons in the seismic-force-resisting system. 9. Erection of precast concrete members. 10. Verification of in-situ concrete strength, prior to stressing of tendons in post tensioned concrete and prior to removal of shores and forms from beams and structural slabs. a. Where applicable, see also Section 1707.1, Special inspection for seismic resistance. X X X X ACI 318: Ch. 16 ACI 318: 6.2 ACI 318: 18.20 ACI 318: 18.18.4

1906.2

SICC-703.2 Particular Elements.

a. Concrete formwork. The SIER shall verify that the formwork materials, cleanliness, size, and installation conform to approved formwork fabrication and erection documents, prior to placement of concrete.

b. Reinforcing steel. The SIER shall verify that reinforcing steel is in compliance with County approved construction documents and SER approved fabrication and erection documents, including welding of reinforcement of the structural seismic-force-resisting system.

c. Tendons to be post-tensioned. The SIER shall verify that tendons to be post-tensioned are in compliance with County approved construction documents and SER approved fabrication and erection documents, including full-time monitoring of grouting, consolidation and reconsolidation of bonded