X hits on this document

205 views

0 shares

0 downloads

0 comments

63 / 76

Appendix A Blank Forms

Page 2 of 3 PROJECT:

SCHEDULE OF SPECIAL INSPECTIONS

Prepared By:

Date:

Y/N

AGENT *

REFERENCES

SER

NC State Building Code 1704.2, 1704.3, 1707, 1708.4 & SICC Chapter 6 NC State Building Code 1704.2, 1704.4, 1708.3 SICC Chapter 7 & 8 NC State Building Code 1704.2, 1704.5, 1708.1 & SICC Chapter 9 NC State Building Code 1704.2, 1704.6, 1707.3 & SICC Chapter 10 NC State Building Code 1704.7 & SICC Chapter 11 NC State Building Code 1704.2, 1704.8, 1808, 1809, 1810, 1811 & SICC Chapter 1104.2 NC State Building Code 1704.9, 1808, 1812 & SICC 1104.2 NC State Building Code 1806.2 & SICC Chapter 12 NC State Building Code 1704.11 & SICC Chapter 13 NC State Building Code 1704.12 & SICC Chapter 14 NC State Building Code 1704.14 & SICC Chapter 15 NC State Building Code 1621, 1707.5, 1707.6, 1707.7 & 1708.5 NC State Building Code 1702 & 1709 To be conducted by the Structural Engineer of Record NC State Building Code 1704.13

ACTIVITY/SYSTEMS

Steel Construction, Fabrication & Seismic Resistance Concrete Construction, Fabrication & Seismic Resistance Masonry Construction, Fabrication & Seismic Resistance Wood Construction, Fabrication & Seismic Resistance Soils

Pile Foundations & Fabricators

Pier Foundations

Earth Retention Systems

Sprayed Fire Resistance Materials

EIFS

Smoke Control

Seismic Resistance, Architectural, Mechanical & Electrical Components Structural Observations required in Seismic Use Group II or III

Special Cases

  • *

    INSPECTION AGENTS

    • 1.

      Special Inspections Engineer of Record 1:

Name,

Company,

Address

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

2. Inspection and Testing Agency 1 A:

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

3. Special Inspections Engineer of Record 2:

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

4. Inspection and Testing Agency 2 A:

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

5. Special Inspections Engineer of Record 3:

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

6. Inspection and Testing Agency 3 A:

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Note: The inspectors and testing agencies shall be engaged by the Owner or the Owner’s Agent, and not by the Contractor or Subcontractor whose work is to be inspected or tested. Any conflict of interest must be disclosed to the Building Official, prior to commencing work.

Page 63

Document info
Document views205
Page views205
Page last viewedSat Dec 10 20:42:02 UTC 2016
Pages76
Paragraphs2201
Words27762

Comments