X hits on this document

183 views

0 shares

0 downloads

0 comments

71 / 76

Monthly Engineers Summary Report Catawba County, North Carolina

Date

_____________

TPI Permit #

_________________

Report #

________________________

Monthly Summary Report Covering Daily Reports dated:

From

_____________

To

____________

Summary Report Covering Laboratory Test Results dated

_________________________________

Describe inspections made: ______________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________

Describe tests made (attach copy of test results) : _____________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________

Discrepancy, list items requiring correction, corrections of previous listed items and previously listed uncorrected items: ______________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________

List changes to approved plans authorized by architect or engineer: ______________________________ _____________________________________________________________________________________ _____________________________________________________________________________________

Comments: ___________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________

To the best of my knowledge, work inspected and tests reviewed are in accordance with the building services division approved design drawing, specifications and applicable workmanship provisions of the NC State Building Code except as noted above. Prepared By:

Printed Name:

_________________________

Date:

________________________________

Design Professional Seal

( This report to be furnished to the code enforcement official at time of TPI scheduled site inspections.)

Page 71

Document info
Document views183
Page views183
Page last viewedThu Dec 08 19:51:03 UTC 2016
Pages76
Paragraphs2201
Words27762

Comments