Mineral Resource Statement for the Star Diamond Project including the 100% Shore- owned portion of the Star Kimberlite and the FALC-JV portion (Star West). Reported at an internal cut-off of CAD$5.08 for the Cantuar, Pense, Early Joli Fou (EJF), Mid Joli Fou (MJF) and Late Joli Fou (LJF) kimberlite units. 1,2,3,4,5,6

UNITS

Tonnes (x 1000)

Grade (cpht)

Carats (x 1000)

Cantuar

11,507

15.03

1,729

Pense

8,002

15.64

1,251

EJF Inner

80,516

16.60

13,362

EJF Outer

32,120

9.67

3,106

MJF

18,617

5.42

1,009

LJF

896

4.00

36

TOTAL Indicated

151,659

13.51

20,493

Cantuar

426

7.84

33

Pense

3,178

13.99

445

EJF Inner

2,672

15.86

424

EJF Outer

19,857

10.87

2,158

MJF

1

4.96

0

LJF

30

3.58

1

TOTAL Inferred

26,164

11.70

3,061

Class

Indicated

Inferred

  • (1)

    Mineral resources are accumulated within an optimized floating-cone pit shell.

  • (2)

    Mineral resources which are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be

materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing or other relevant issues. (3) The quantity and grade of reported inferred resources in this estimate are conceptual in nature. There is no guarantee that all or any part of the mineral resource will be converted into a mineral reserve.

  • (4)

    1.0 millimetre bottom cut-off assumed.

  • (5)

    WWW High scenario.

  • (6)

    Due to rounding, figures may not add up to the totals shown.

The following table summarizes that portion of the Star resource estimate that falls within the 100% Shore owned portion of the Star resource.

UNITS

Tonnes (x 1000)

Grade (cpht)

Carats (x 1000)

Cantuar

4,985

12.67

632

Pense

8,002

15.64

1,251

EJF Inner

58,886

16.57

9,760

EJF Outer

27,378

9.72

2,662

MJF

1,651

4.60

76

LJF

158

4.54

7

TOTAL Indicated

101,062

14.24

14,388

Cantuar

347

6.32

22

Pense

3,178

13.99

445

EJF Inner

1,282

17.30

222

EJF Outer

17,762

10.94

1,943

MJF

0

0.00

0

LJF

25

3.62

1

TOTAL Inferred

22,594

11.65

2,632

Mineral Resource Statement for the Star Diamond Project (100% Shore) only. Reported at an internal cut-off of CAD$5.08 for the Cantuar, Pense, Early Joli Fou (EJF), Mid Joli Fou

(MJF) and Late Joli Fou (LJF) kimberlite units.1,2,3,4,5,6

Class

Indicated

Inferred

  • (1)

    Mineral resources are accumulated within an optimized floating-cone pit shell.

  • (2)

    Mineral resources which are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be

materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing or other relevant issues. (3) The quantity and grade of reported inferred resources in this estimate are conceptual in nature. There is no guarantee that all or any part of the mineral resource will be converted into a mineral reserve.

  • (4)

    1.0 millimetre bottom cut-off assumed.

  • (5)

    WWW High scenario.

  • (6)

    Due to rounding, figures may not add up to the totals shown.

P&E Mining Consultants NI 43-101 Technical Report No 159 Shore Gold - Star Diamond Project

vii

Document info
Document views313
Page views313
Page last viewedFri Dec 09 03:18:24 UTC 2016
Pages124
Paragraphs4911
Words42686

Comments