X hits on this document

26 views

0 shares

0 downloads

0 comments

3 / 6

Figure 2 Static Torque Test Assembly

Torque Test Tool

Dust Cap

Rotatable Adapter

Torque Test Assembly

  • 6.

    PRE-TEST PROCEDURES

    • 6.1

      Place the traffic cones around the perimeter of the Phase I spill containers, allowing sufficient space to safely conduct the test.

    • 6.2

      Remove the lids of the Phase I spill containers. Visually determine that the adaptors are of the rotatable design.

    • 6.3

      Inspect the dust caps to ensure that the caps and that the gaskets are intact and do not show signs of excessive wear or damage.

6.4

Inspect the rotatable adaptors. If the adaptors are wet or covered with a lubricant, wipe the adaptors clean to ensure maximum friction between the dust cap and the adaptor seal surface.

OPW Fueling Components - Phase I Vapor Recovery System – VR-102-A

Document info
Document views26
Page views26
Page last viewedSat Jan 21 18:41:39 UTC 2017
Pages6
Paragraphs194
Words1235

Comments