operational clearances, wiring diagrams and relationship to adjacent work.

D.

LEED Submittals:  Provide documentation of how the requirements of Credit will be met.

E.

Window Treatment Schedule:  For all roller shades.  Use same room designations as indicated on the Drawings, field verified window dimensions, quantities, type of shade, controls, fabric, and color, and include opening sizes and key to typical mounting details.

F.

Selection Samples:  For each finish product specified, two complete sets of shade cloth options and aluminum finish color samples representing manufacturer's full range of available colors and patterns.

G.

Verification Samples:  For each finish product specified, two complete sets of shade components, unassembled, demonstrating compliance with specified requirements.  Shade fabric sample and aluminum finish sample as selected, representing actual product, color, and patterns.  Mark face of material to indicate interior faces.

H.

Maintenance Data:  Methods for maintaining roller shades, precautions regarding cleaning materials and methods, instructions for operating hardware and controls.

I.

Manufacturer's Certificates: Certify products meet or exceed specified requirements.

1.5

QUALITY ASSURANCE

A.

Manufacturer Qualifications: Obtain roller shades through one source from a single manufacturer with a minimum of twenty years experience in manufacturing products comparable to those specified in this section.

B.

NFPA Flame-Test: Passes NFPA 701. Materials tested shall be identical to products proposed for use.

C.

Mock-Up:  Provide a mock-up of one of each type roller shade assembly specified for evaluation of mounting, appearance and accessories.

1.

Locate mock-up in window(s) designated by Architect.

2.

Do not proceed with remaining work until mock-up is accepted by Architect.

1.6

DELIVERY, STORAGE, AND HANDLING

A.

Do not deliver window shades until building is enclosed and construction within spaces where shades will be installed is substantially complete.

B.

Deliver products in manufacturer's original, unopened, undamaged containers with labels intact.

C.

Label containers and shades according to Window Shade Schedule.

D.

Store products in manufacturer's unopened packaging until ready for installation.

1.7

SEQUENCING

A.

Ensure that locating templates and other information required for installation of products of this section are furnished to affected trades in time to prevent interruption of construction progress.

12494-2