X hits on this document

28 views

0 shares

0 downloads

0 comments

9 / 9

acoustical panel ceilings specified in Section 09 51 23.

D.

Coordinate installation of recessed shade pockets with construction of suspended gypsum board ceilings specified in Section 09 21 16.

3.3

INSTALLATION

A.

Install in accordance with manufacturer's instructions.

B.

Install roller shades level, plumb, square, and true.  Allow proper clearances for window operation hardware.

C.

Install the following items to conceal roller and operating mechanism. Do not use exposed fasteners.

1.

Fascias.

2.

Closure panels.

3.

Endcaps.

3.4

TESTING AND DEMONSTRATION

A.

Demonstrate operation of shades to Owner's designated representatives.

3.5

PROTECTION

A.

Protect installed products until completion of project.

B.

Touch-up, repair or replace damaged products before Substantial Completion.

3.6

SCHEDULES

A.

Refer to Drawings for shade types and locations.

END OF SECTION

12494-9

Document info
Document views28
Page views28
Page last viewedSat Dec 03 21:57:39 UTC 2016
Pages9
Paragraphs365
Words3493

Comments