X hits on this document

PDF document

STANDARD FEATURES - page 9 / 10

19 views

0 shares

0 downloads

0 comments

9 / 10

Page __________

of

__________

Packaging Scheme and Ordering

Model VR

Burner Box Packaging Scheme Tube Packaging Scheme

 Ordering for a Specific Job - Burner boxes are factory-built and shipped in the sizes indicated in the table below.

All cartons include the hardware required for assembly. Each tube package includes the equipment necessary to assemble that section including reflectors, reflector brackets, compres- sion couplings, and turbulator strips.

Tube lengths ordered should match the capacity of the heater ordered.

 Ordering Burner Boxes for Stock - Burner boxes are de- signed for convenience of the stocking distributor.

Packaging of Burner/Control Boxes - Burner/control boxes are shipped in individual cartons. Each carton is identified by the Order No. and the Model and Serial No. of the heater.

Tubes for any standard length of heater are packaged in a maximum of only four carton types. The Packaging Scheme allows the stocking distributors to inventory the tube pack- ages in whatever lengths meets their most frequent require- ments.

Packaging Scheme for Tubes - A maximum of only three packages is required to “build” any standard length of straight tubular system. All packages are identified by No. and con- tents. Cartons are engineered and packaged to allow for nor- mal freight handling.

By matching the burner/control boxes and the tube packaging scheme, a variety of heater sizes and lengths are “in stock” with minimum inventory.

Packaging Scheme by Size for Straight Tubes

Contents of Tube Packages

Part Number

205204 205205 205206 205151

De si r e d

Model

Heater Tube

MBH Input

Number

Length Range

50

VR50

20 - 40 ft.

75

VR75/100

20 - 40 ft.

100

VR75/100A

30 - 50 ft.

125

VR125/150

30 - 60 ft.

150

VR125/150B

40 - 60 ft.

175

VR175/200

40 - 70 ft.

200

VR175/200C

50 - 70 ft.

(1)

(1)

-

-

(1)

(2)

(2)

(3)

(4)

(2)

(1)

(2)

10 ft. (3M) Combustion

Chamber Tube 10 ft. (3M) Heat Exchanger Tube Turbulators

A

VR75/100 - is factory-built as 75 MBH and includes a con- version kit to field-convert to 100 MBH.

B

VR125/150 - is factory-built as 125 MBH and includes a conversion kit to field-convert to 150 MBH.

C

VR175/200 - is factory-built as 175 MBH and includes a conversion kit to field-convert to 200 MBH.

Optional tubes are shipped separately in individually labeled

Shape

Option Number

5 ft. Straight

UA1

"U" Bend

UB3

"L" Bend

UC2

cartons.

Reznor’s packaging scheme keeps the number and variety of packages to a minimum. By limiting the number of different cartons, the packaging scheme is designed to be beneficial for both maintaining inventory and ordering for a specific job. All Model VR Heaters require a burner/control box, and a combustion chamber tube. The “length” of the system is determined by the number of straight heat exchanger tubes that are positioned after the combustion chamber tube. Refer to the installation manual to determine correct number of turbulator strips to be installed.

TOTAL SYSTEM

LENGTH Feet Meters

20

6.1

30

9.1

40

12.2

50

15.2

60

18.3

70

21.3

CHAMBER

EXCHANGERS

1

1

1

2

1

3

1

4

1

5

1

6

REQUIRED

COMPONENTS

COMBUSTIO

N HEAT

REQUIRES THE FOLLOWING

PART NUMBERS

1 EACH

2 EACH

205204

-

205205

-

205204 & 205206

-

205204 & 205151

-

205205 & 205151

-

205205

205056

Page 14

Document info
Document views19
Page views19
Page last viewedThu Dec 08 08:19:16 UTC 2016
Pages10
Paragraphs1217
Words5499

Comments