Gas RATA Observation Sheet                                                                                 Appendix A

Gas RATA Observation

1.  Plant and RATA Information

Plant Name:

ORIS Code:

State:

State Plant ID:

Plant Contact:

Phone Number:

Test Firm:

Crew Chief:

Inspector Name:

RATA Date:

2.  Unit/System Information

Stack/Unit ID:

Parameter Monitored:

System/Component ID:

Span Value:

3.  RATA Observations

RATA Checks

Observations

Unit Operation Conditions:

Check and record unit fuel and operating load.  Is the load level stable throughout the RATA test?

The fuel should be a normal fuel listed in the monitoring plan (App. A, ' 6.5(a))

RATA should be performed at normal load.  Check the load against the monitoring plan normal load.

Fuel Burned:

Load During Test (Run/Load):

CEMS Calibration Error Test (Prior to the RATA)

Zero Result:

Upscale Result:

Were any pre-RATA adjustments made to the CEMS?

Pre-RATA non-routine adjustments are allowed by Part 75.  Adjustments may not be made between runs at a load level or between load levels except for routine adjustments as a result of the calibration error test (App. B ' 2.1.3).

(cont.)

Page A-14                                                                                                       Part 75 Field Audit Manual – July 16, 2003

Document info
Document views156
Page views156
Page last viewedMon Jan 23 19:45:21 UTC 2017
Pages41
Paragraphs991
Words7648

Comments