X hits on this document

101 views

0 shares

0 downloads

0 comments

26 / 41

Appendix A                                                                                Flow RATA Observation Sheet

Note - The RATA observations suggested in this checklist, beginning with item 4, are for flow RATAs performed using Method 2.  A detailed observer checklist is available and should be used for new Reference Methods 2F, 2G, and 2H.  See CAMD=s website at:  http://www.epa.gov/airmarkets/monitoring/index.html

Flow RATA Observation

   1.  Plant and RATA Information

Plant Name:

ORIS Code:

State:

State Plant ID:

Plant Contact:

Phone Number:

Test Firm:

Crew Chief:

Inspector Name:

RATA Date:

    2.  Unit/System Information

Stack/Unit ID:

Stack Diameter:

System/Component ID:

Stack Area:

Span Value:

Normal Load Levels (circle)

H     M     L

    3.  RATA Observations

RATA Checks

Observations

Unit Operation Conditions:

Check and record unit fuel and operating load.  Is the load level stable throughout the RATA test?

The fuel should be a normal fuel listed in the monitoring plan (App. A, ' 6.5(a)).

For certification and recertification, must perform flow RATA at three loads for most units (only one load level is required for peaking units or bypass stacks).  Regular QA Flow RATAs must be performed at a minimum of 2 loads (one load for: peaking units or bypass stacks; alternate tests if conducted semiannually; or units that conduct supporting 1-load test analysis) (App. A, ' 6.5.2).

Fuel Burned:

Load During Test (Run/Load):

Daily Calibration Error Test performed prior to the RATA

Zero Result:

Upscale Result:

(cont.)

3.  RATA Observations (cont.)

RATA Checks

Observations

Part 75 Field Audit Manual - July 16, 2003                                                                                                       Page A-22

Document info
Document views101
Page views101
Page last viewedWed Dec 07 12:33:55 UTC 2016
Pages41
Paragraphs991
Words7648

Comments