X hits on this document

89 views

0 shares

0 downloads

0 comments

15 / 42

3

12

VISIONING SESSION RESULTS

ROUTE 31 WEST CORRIDOR DESIGN GUIDE

DRAFT: MARCH 2009

VISIONING PROCESS

T&B Planning and Mackin Engineering consultants and invited to lead stakehold visioning sessions and public meetings between June 2008 and February 2009. participated in the process included munici owners, residents, and land owners/deve

Three stakeholder meetings and one p focused on visioning. The goals of the first were to establish an understanding of the to define the experience of traveling al and to determine forces of change that c positively and negatively in the future.

A Community Image Survey (CIS) was stakeholder meeting and a general public 2008. A total of 83 persons participated participants viewed a series of 60 image rate their preference for each image. Th T&B Planning determined what type and building features, and other improvemen along the Corridor. Also, participants i that should be addressed and identified com that the community wants to support. S Corridor’s future were then established.

During the third stakeholder meeting, a co draft design recommendations were pres reacted to the initial concepts and assis refining the vision and design concepts. recommendations were removed and ot or added. Through this visioning process ed Jefferson and Somerset Townships in vision and design guidelines presented in this document.

Document info
Document views89
Page views89
Page last viewedSun Dec 04 09:07:21 UTC 2016
Pages42
Paragraphs704
Words7091

Comments