X hits on this document

49 views

0 shares

0 downloads

0 comments

8 / 26

No. 00.05 Page -8-

  • p.

    Ferguson Contractors, Ltd., contractor for paving and drainage improvements in the Forest Cove Subdivision, Phases I and II in Precinct 4, resulting in an addition of $72,950 to the contract amount (26677).

  • q.

    L.N. McKean, Inc., contractor for repairs/replacement of concrete pavement, curbs, driveways, sidewalks, and related items in Precinct 4, resulting in no change to the contract amount (26632).

r.

SCI

Contractors,

Inc.,

contractor

for

construction

and

realignment

of

Kuykendahl Road in Precinct 4, resulting in an addition of $15,300 to the contract amount (26659).

  • s.

    SCI Contractors, Inc., contractor for base repairs, hot in-place recycling on Louetta Road from Stuebner Airline Drive to T.C. Jester Boulevard in Precinct 4, resulting in an addition of $97,856 to the contract amount (26658).

  • t.

    SCI Contractors, Inc., contractor for temporary traffic signal and road widening on Cutten Road and Burgeois Road in Precinct 4, resulting in an addition of $5,152 to the contract amount (26648).

  • u.

    SER Construction, Inc., contractor for storm sewer and inlet installation on Firesign Drive in Precinct 4, resulting in a reduction of $1,855 from the contract

amount (26662). v. South Coast Construction, Inc

., contractor for construction and traffic signal

installation on Fallbrook Drive at Veterans Memorial Drive in Precinct 4, resulting in a reduction of $12,147 from the contract amount (26640).

  • w.

    Southwest Signal Supply, contractor for traffic improvements on Antoine Drive at Bridge Forest, Chippewa, West Greens, and Maywood Forest Drive in Precinct 4, resulting in an addition of $25,054 to the contract amount (26293).

  • x.

    Texas Sterling Construction, Inc., contractor for paving, drainage, and improvements on Brittmoore Road from Tanner Road to north of West Little York Road in Precinct 4, resulting in an addition of $30,500 to the contract amount (26645).

  • y.

    Integrated Telecommunication, Inc., contractor for fiber optic traffic signal communication cable installation for Ella Boulevard on Richey Road to FM 1960, Stuebner Airline, and others in Precinct 4, resulting in a reduction of $114,107 from the contract amount (26292).

  • 6.

    Recommendation for authorization to negotiate with:

    • a.

      A.I. Associates, Inc., for engineering services for preliminary, design and contract phase for West Little York Road from Bear Creek Plantation Subdivision to Barker Cypress Road in Precinct 3.

    • b.

      Sunland Engineering for engineering services for the design and construction of the Castlebridge Drive road crossing of HCFCD Unit E135-01-00 in Jersey Village in Precinct 4.

  • 7.

    Recommendation for authorization to issue or increase purchase orders for testing and inspection services to:

    • a.

      Hercules Engineering for reconstruction of Wade Road from IH-10 to Wallisville Road in Precinct 2 in the amount of $89,457.

Document info
Document views49
Page views49
Page last viewedSun Dec 04 01:55:08 UTC 2016
Pages26
Paragraphs842
Words9179

Comments