X hits on this document

PDF document

New York City Transit Hybrid and CNG Transit Buses: Interim Evaluation Results - page 60 / 64

162 views

0 shares

0 downloads

0 comments

60 / 64

Exhaust System Repairs (ATA VMRS 43)

Parts Cost

659.38

624.00

Labor Hours

37.0

102.7

Average Labor Cost

1,850.00

5,135.00

Total Cost (for system)

2,509.38

5,759.00

Total Cost (for system) per Bus

250.94

575.90

Total Cost (for system) per Mile

0.01

0.03

2,744.56

753.57

99.4

24.0

4,970.00

1,200.00

7,714.56

1,953.57

771.46

195.36

0.04

0.01

Fuel System Repairs (ATA VMRS 44) Parts Cost Labor Hours Average Labor Cost Total Cost (for system) Total Cost (for system) per Bus Total Cost (for system) per Mile

Breakdown of Maintenance Costs by Vehicle System

4,823.30

5,697.43

0.27

0.29

Fleet Mileage

Total Engine/Fuel-Related Systems (ATA VMRS 27, 30, 31, 32, 33, 41, 42,

Total Cost (for system) per Bus

Total Cost (for system) per Mile

14,207.96

6,336.75

680.5

1012.8

34,025.00

50,637.50

48,232.96

56,974.25

CNG (Eval) 257,624

Hybrid (Eval) 194,395

43, 44, 45, 46) Parts Cost Labor Hours Average Labor Cost Total Cost (for system)

Electrical System Repairs (ATA VMRS 30-Electrical General, 31-

Charging, 32-Cranking, 33-Ignition)

Parts Cost

4,101.95

Labor Hours

263.3

Average Labor Cost

13,165.00

Total Cost (for system)

17,266.95

Total Cost (for system) per Bus

1,726.70

Total Cost (for system) per Mile

0.10

622.37 143.0 7,150.00 7,772.37 777.24 0.04

Electric Propulsion Repairs (ATA VMRS 46)

Parts Cost

0.00

1,937.07

Labor Hours

0.0

460.5

Average Labor Cost

0.00

23,025.00

Total Cost (for system)

0.00

24,962.07

Total Cost (for system) per Bus

0.00

2,496.21

Total Cost (for system) per Mile

0.00

0.13

2,266.44

1,606.98

126.6

151.1

6,330.00

7,552.50

8,596.44

9,159.48

859.64

915.95

0.05

0.05

Power Plant (Engine) Repairs (ATA VMRS 45) Parts Cost Labor Hours Average Labor Cost Total Cost (for system) Total Cost (for system) per Bus Total Cost (for system) per Mile

55

Document info
Document views162
Page views162
Page last viewedFri Dec 09 04:32:16 UTC 2016
Pages64
Paragraphs2744
Words18459

Comments