X hits on this document

243 views

0 shares

0 downloads

0 comments

44 / 107

2.

Whenever any PUD is proposed, before any building permit for the erection of a permanent building in such PUD shall be granted, and before any subdivision plat of any part thereof may be filed in the office of the Township Clerk, the developer or his authorized agent shall apply for and secure approval of such PUD in accordance with the following procedures and including subsequent approval of the preliminary site plan and the final detailed site plan by the Township Planning Commission.

Application for Sketch Plan Approval

a.

In order to allow the Township Planning Commission and the developer to reach an understanding of basic design requirements prior to detailed design investment, the developer shall submit eight (8) copies of a sketch plan of his proposal to the Township Planning Commission. The sketch plan shall be approximately to scale, though it need not be to the precision of a finished engineering drawing; and

it

shall

clearly show

the

following

information:

  • 1.

    Boundaries of the property.

  • 2.

    The location of the various uses and their

areas in acres.

  • 3.

    The location and height of all building and parking facilities.

  • 4.

    The interior roadway system and all existing rights-of-way and easements, whether public or private.

5.

Delineation of the various areas, indicating for each such area, its size and composition in terms of total number of units, approximate percentage allocation by facility unit type (i.e., single-unit, detached, duplex, townhouse, high-rise site, etc.) plus a calculation of the density in units per net acre (total area excluding interior roadways) for each such area.

41

Document info
Document views243
Page views243
Page last viewedMon Dec 05 03:38:37 UTC 2016
Pages107
Paragraphs2429
Words31573

Comments