X hits on this document

402 views

0 shares

0 downloads

0 comments

49 / 107

3.

  • d.

    Relationship of the various uses to one another.

  • e.

    Adequacy, type, and arrangement of trees, shrubs, and other landscaping constituting a visual and/or a noise deferring buffer between adjacent uses and adjoining lands.

  • f.

    In the case of multiple units, the adequacy of usable open space for playgrounds and recreation.

  • g.

    Adequacy of storm water and sanitary waste disposal facilities.

  • h.

    Adequacy of structures, roadways, and landscaping in areas with moderate to high susceptibility to flooding, ponding and/or erosion.

  • i.

    Compliance with all regulation of this ordinance.

Action on Preliminary Site Plan Application.

Within thirty (30) days of the receipt of the complete application for preliminary site plan approval, the Township Planning Commission shall meet to consider the request. The Township Planning Commission then shall act on the request within the sixty (60) days after this meeting. If no decision is made within the sixty (60) day period, the preliminary site plan shall be considered approved. The Township Planning Commission’s action shall be in the form of a written statement to the applicant stating whether or not the preliminary site plan is approved. A copy of the appropriate minutes of the Township Planning Commission shall be sufficient report.

The Township Planning Commission’s statement may include recommendations as to the desirable revisions to be incorporated in the final site plan, of which conformance

46

Document info
Document views402
Page views402
Page last viewedTue Jan 24 03:44:24 UTC 2017
Pages107
Paragraphs2429
Words31573

Comments