X hits on this document

PDF document

FINAL REGULATION ORDER – PART 3 - page 3 / 5

10 views

0 shares

0 downloads

0 comments

3 / 5

Table 1 Spark-ignition Engine Requirements* (No Change)

NOTE: Authority cited: Sections 39600, 39601, 41752, 41753, 41754, 41755, 43013(b) and 43018, Health and Safety Code. Reference: Sections 41750, 41751, 41752, 41753, 41754, and 41755, Health and Safety Code.

§ 2457.

Requirements for portable equipment units. (No Change)

§ 2458.

Recordkeeping and reporting. (No Change)

§ 2459.

Notification. (No Change)

§ 2460.

Testing. (No Change)

§ 2461.

Fees.

(a)-(b) (No Change)

(c) Except as provided in (j) below, Tthe owner or operator of a portable engine or equipment unit shall submit fees to the Executive Officer in accordance with Table 2. Until December 31, 2005, new program participants shall pay an increased registration fee in accordance with Table 2. This increased fee shall not apply to agricultural sources or new program participants who have lost permit exemption due to the lowering of the maximum rated horsepower (bhp) permit requirement threshold.

(d) Except as provided in (j) below, Pprior to switching from non-operational to operational status, the owner or operator shall pay the applicable fee as listed in Table 2. The Executive Officer shall verify that the portable engine or equipment unit meets the requirements of this article prior to operation of the portable engine or equipment unit.

(e) Except as provided in (j) below, Aa district may collect an enforcement inspection fee as listed in Table 2 one time per calendar year for each registered portable engine or equipment unit inspected. When multiple registered portable engines or equipment units are inspected at a given source or location, the district inspection fee shall be equal to the lesser of the actual cost, including staff time, for conducting the inspection or the fee as listed in Table 2 per registered portable engine or equipment unit inspected. If the district performs an inspection leading to determination of non- compliance with this article, or any applicable state or federal requirements, the district may charge a fee as listed in Table 2 per portable engine or equipment unit for each inspection necessary for the determination and ultimate resolution of the violation. In no event shall the total fees exceed the actual costs, including staff time, to the district of conducting the investigations and resolving any violations.

(f) Except as provided in (j) below, Ffailure to pay renewal fees when due shall result in penalties. If a fee payment is not received or postmarked by the specified due date, fee

Page 3 Final 12-21-06

Document info
Document views10
Page views10
Page last viewedSat Dec 10 06:21:15 UTC 2016
Pages5
Paragraphs158
Words1497

Comments