X hits on this document

33 views

0 shares

0 downloads

0 comments

13 / 14

7

PARTIAL LIST OF PERSONS CONTACTED

  • R.

    Barrett

  • R.

    Burroni

  • F.

    Dacimo

  • J.

    Comiotes

  • J.

    DeRoy

  • R.

    Deschamps

  • D.

    Mayer

  • J.

    Perrotta

  • K.

    Peters

  • P.

    Rubin

  • J.

    Russell

  • A.

    Vitali

  • J.

    Wheeler

Closed

Site Executive Officer I&C Manager Plant Manager General Manager-Operations Director, IP-3 Engineering Health Physics Manager General Manager-Support Services Quality Assurance Manager Licensing Manager Assistant Operations Manager General Manager-Maintenance Maintenance Manager Training Manager

ITEMS OPENED, CLOSED, AND DISCUSSED

LER 2000-002-00

Plant Outside Design Basis Due to Routing of Component Cooling Water Piping Within the Fuel Storage Building Which was not Designed for Tornado Effects During Original Plant Design

LER 2000-003-00

Automatic Actuation of Auxiliary Boiler Feedwater Pump 32 During Testing of Emergency Diesel Generator 32 Due to High Resistance in the Contacts of the Reset Switch in the Non-Safety Injection Blackout Logic Defeat Circuitry

LIST OF ACRONYMS USED

ABFP ACTS AOV BOP CCR CCW CFR CIV DER EDG LER MR NRC NSE NYPA OD PT RHR SI SOV TS

Auxiliary Boiler Feedwater Pump Action Commitment Tracking System Air-Operated Valve Balance-of-Plant Central Control Room Component Cooling Water Code of Federal Regulations Containment Isolation Valve Deficiency and Event Report Emergency Diesel Generator Licensee Event Report Maintenance Rule Nuclear Regulatory Commission Nuclear Safety Evaluation New York Power Authority Operability Determination Periodic Test Residual Heat Removal Safety Injection Solenoid-Operated Valve Technical Specification