2003 SPECIFICATIONS

SECTION 108

JOB NO. 4404 FAP NO. F-102-2(51) CROCKETTVILLE AVE / HWY 27 SIGNALS (CROCKETVILLE) April 25 thru May 1, 1999

April 25 174/250

SUNDAY

Clear

NO TIME CHARGED: Project Substantially Complete

Hi 78 Low 48

April 26

MONDAY

Clear

Working Conditions:

Good

Hi 80 Low 55

174/250

NO TIME CHARGED: Project Substantially Complete Engineering Activities: None Contractor’s Work - Roadway: None Instructions to Contractor: None

COMMENTS: 30 day performance test completed this date. 6 month warranty period will conclude on October 26, 1999

NOTE: NO FURTHER WEEKLY DIARIES WILL BE SUBMITTED UNTIL THE SIX MONTH WARRANTY PERIOD IS COMPLETE, UNLESS THERE ARE ACTIVITIES OR COMMENTS PERTAINING TO THE PROJECT AT WHICH TIME A DIARY INDICATING ACTIVITIES OR COMMENTS WILL BE SUBMITTED FOR THAT WEEK.

Figure 108-11 SAMPLE OF DIARY NOTE ENDING 30 DAY PERFORMANCE TEST/BEGINNING OF 6 MONTH WARRANTY PERIOD FOR SIGNALS

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

108.10

Partnering.

The

Department

recognizes

the

need

to

develop

a

relationship

of

mutual trust and respect with Contractors that are awarded highway construction contracts. A "Partnering Requirements" Special Provision has been developed to assist in this area. "Partnering" is a PROCESS whereby the Owner (AHTD) and the Contractor develop a formal strategy of commitment and communication.

The key elements of "Partnering" are:

Commitment of top management (AHTD and Contractor) Trust Development of Mutual Goals and Objectives. (Examples - Limiting Cost, No

lost time accidents, etc.)

Equity. ALL considered in

parties' (AHTD and Contractor) goals and "Development of Mutual Goals/Objectives"

objectives are and there is

commitment to satisfying these goals and objectives from all parties Implementation. Development of procedures to accomplish Mutual Objectives Continuous Evaluation Timely Responsiveness. Handling of conflicts and disagreements at level possible

Goals and

the lowest

Utilization of the "Partnering Requirements" Special Provision (when included in a contract) is optional on the part of the Contractor. If the Contractor notifies the Resident Engineer that he has elected to utilize this process, the Resident Engineer shall contact the Staff Construction Engineer to set up an initial "partnership development/team building" workshop.