X hits on this document

931 views

0 shares

0 downloads

0 comments

189 / 220

2003 SPECIFICATIONS

SECTION 112B

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSTRUCTION INSPECTION REPORT

Interim

XX

Semi-Final

____

AHTD Oversight

XX

Job Name: XYZ SIDEWALKS AND SAFETY

Job No: 069288 County: Pulaski Contractor: DEF, Inc

Route: ABC Road

FHWA Oversight _____ Date:10-12-00 ENHN 521-5(1) FAP No:

Resident Engineer: City of West End

Work Order Issued:

8-12-00

Date Work Began:

8-12-00

Contract Time Limit: Time Charged to Date:

60 WD 32 WD

Date Work Substantially Complete (Time Charges Stopped):

N/A

Inspection Party:

Andrew Thomas, Resident Engineer 66, Roger Chafee, Consultant

Inspector for City of West End

Remarks:

DROP INLET WORK: The Contractor was observed pouring 2 Drop inlets at 1st & Broadway. No Problems noted EROSION CONTROL: Silt Fence was considered serviceable. SIDEWALK WORK: Consultant Inspector appeared to be aware of ADA requirements.

___________________________________________ Resident Engineer

Figure 112B-2

SECTION 113

Page 100-165

7-01-03

Document info
Document views931
Page views931
Page last viewedSat Dec 10 13:52:41 UTC 2016
Pages220
Paragraphs6755
Words74435

Comments