2003 SPECIFICATIONS

SECTION 105

SECTION 105 CONTROL OF THE WORK

105.01

Conference with Highway Department Personnel.

Engineer should construction. The

hold object

a of

conference with project the conference is to review

personnel prior the major work of

The Resident to beginning the project and

to make clear to the project frequency of inspections and

personnel their individual tests, to whom they are to

responsibilities, duties, report, what constitutes

hours, proper

reporting, materials proposed questions personnel

if their operation is subject to check, and what to do when unacceptable or work are encountered, or when unsatisfactory methods or equipment is for use by the Contractor. Such a conference should allow time for any to be answered that might otherwise remain in the minds of the project and reduce their effectiveness.

Section 108 of this

Conference.

In

addition

to

manual details requirements that Conference, on-site pre

of the Preconstruction work conferences with

Contractor personnel are very productive in establishing a "game plan" on phases of work

which are significant and/or structural steel erection, bridge

complicated, such as concrete paving, asphalt paving, deck concrete, concrete pavement patching, traffic control

plans, etc. supervising

The Resident Engineer is these types of operations

encouraged to

assemble the

and develop a

"game plan"

people who will be BEFORE the work

begins. minutes

This group of informal

should include both discussion about the

Contractor and Department Personnel. Contractor's plans and his corresponding

A few needs,

and the Department's requirements and the performance of both Department and

commitments will have Contractor personnel.

a

positive

impact

upon

Prior to the meeting, the Resident Engineer should prepare an outline of the topics which need to be discussed. After the meeting, the Resident Engineer should note what was discussed, issues raised, and questions which need to be resolved. By doing this there should a better understanding of all concerns and, as a result, there will be a smoother operation with fewer problems.

105.02 Duties of Department Personnel. The duties of AHTD personnel are outlined in Subsections 105.10, 105.11, and 105.12 of the Standard Specifications and

are

further described in Section 115 of this Manual.

105.03

Conformity

with

the

Plans

and

Specifications.

Payment to the

Contractor will be withheld for non complying materials and/or workmanship.

(a)

When the materials and/or work is not an item with price reduction

procedures in the Standard Specifications and it is not in reasonably close conformity with the plans and Specifications, the Resident Engineer shall forward the copies of pertinent information and/or the original and the copies of test reports normally sent to Materials Division, along with appropriate comments, to the District Engineer. The District Engineer will make a recommendation to the State Construction Engineer for the disposition of the material or work in question. The State Construction Engineer will review this information and consult with other Divisions as appropriate and determine the

disposition

of

the

non

specification

material

and/or

work.

If

it

is

decided

that

the

Page 100-21

7-01-03

Document info
Document views821
Page views821
Page last viewedMon Dec 05 10:50:08 UTC 2016
Pages220
Paragraphs6755
Words74435

Comments