The Resident Engineer will inform the District Engineer sufficiently in advance of

the anticipated completion of a construction contract to permit a preliminary inspection by District personnel. Upon completion of a project, the Resident Engineer and the District Engineer will determine which Divisions and/or agencies should be represented at the Final Inspection. On Projects with FHWA Oversight, this information, along with a suggested time and date for the inspection, will then be provided to the Construction Office so the Final Inspection can be scheduled with the appropriate offices. This may be

done verbally or by memorandum.

On projects with State Oversight, these arrangements

are handled by the District or the Resident Engineer.

NOTE:

See Section 110 of this

Certification of Construction requirements a Corps of Engineers Section 404 permit.

for

Manual regarding Final Inspections of

Section 404 Permit all projects involving

NOTE: See Section 112 of this Manual for Final Inspections of Railroad Signalization Projects.

NOTE: See Section 717 of this Manual for Semi-Final and/or Final Inspections of Traffic Signalization Projects.

105.12.

Final Construction Inspection Report. One of the

Inspection

Report

forms,

Figure

105-4,

is

to

be

used

to

document

two Construction inspection of all

construction projects. Oversight Plan agreed

to

These forms were developed to accommodate by FHWA and the Department on October 1, 1993.

the Project The forms

are available on the files: FINSPRT.doc

Construction Directory of the LAN under the MISC subdirectory as and SFINSPRT.doc. Representatives of appropriate State Agencies,

governmental

bodies,

AHTD

divisions,

etc.,

should

be

present

on

the

Final

Inspection,

as

should

representatives

of

the

District

Engineer,

Resident

Engineer,

and

Contractor.

If

the

project Report

is accepted by any entity other than the Department, the Construction Inspection should be signed by its representative -- i.e., City, County, other State Agency,

etc. A copy should be given to all parties present at the inspection. In the event items found incomplete, the Semi-Final Construction Inspection Report should be prepared.

are

The Final Construction Inspection Report will be prepared after all items

deficiencies are complete. The acceptance date for maintenance will be shown

Inspection Report.

This acceptance date is the date

deficiencies

was

verified.

The

State

Construction

Engineer

on which accepts all

correction projects.

on of

and the all

On both FHWA and State Oversight Projects, the completed original of the Final Construction Inspection Report form shall be signed by the District Engineer and submitted to the Construction Office for distribution to appropriate parties.