X hits on this document

PDF document

Dr.-Ing. Rolf Berghoff, Dr.-Ing. J. G. Kim / ERT-Consulting - page 9 / 9

45 views

0 shares

1 downloads

0 comments

9 / 9

A first step with the introduction of the new BGL-slagging bed gasifier was made successful. Further the capacity of the plant is to be extended. For example becomes the present capacity for Shredder- Light-Fraction (SLF or ASR) of 105,000 t/a (pellets) around 33% on 140,000 t/a increases. Thus an important step is done, around the ratio of 5% at SLF/ASR, to be used must, also to fulfill.

  • -

    9-

Document info
Document views45
Page views52
Page last viewedWed Jan 18 21:11:44 UTC 2017
Pages9
Paragraphs463
Words3500

Comments