X hits on this document

133 views

0 shares

0 downloads

0 comments

58 / 66

Responsible Party

d.

CITY

e.

CITY

f.

CITY

g.

CITY

h.

CITY

i.

CITY

j.

CITY

k.

CITY

l.

CITY

m. CITY

n.

CITY

o.

CITY

p.

CITY

q.

CITY

r.

CITY

s. t.

CITY CITY

Ellsworth Sourcewater Protection Plan, Appendix C December 2004 Rev. September 2005 Page 55 of 63

Date Completed

Activity

Task

intake zone

    • Boat inspections

    • Practices at marinas and boat launches

  • d.

    * Require vegetative buffers between large areas of impervious surface so that runoff may be absorbed

  • e.

    Any project that moves earth and requires PB approval must include a buffer planting design

  • f.

    * Restrictions on boat washing, fueling and painting, pier cleaning, and related activities

  • g.

    * Require that public roads, driveways and private ways are designed and maintained such that erosion and storm water runoff are limited

  • h.

    * Require that subdivisions within the watershed restrict vegetative clearing and minimize phosphorus runoff w/ BMPs such as maintenance requirements, buffer strips, infiltrations systems and wet ponds

  • i.

    * Enact and enforce phosphorus control measures for watershed that are more protective than the latest DEP recommended standards for high level of protection

  • j.

    * Subdivisions and development subject to site plan review in rural areas required to follow phosphorus loading measures

  • k.

    * All development and earth disturbance in the watershed that is subject to municipal permitting shall be required to submit a phosphorus control plan for city approval

  • l.

    * Set municipal standards for all new or expanded driveway and road construction in the watershed that requires adherence to phosphorus guidelines

  • m.

    * Revise stormwater runoff standards to assure that catch basins and other measures keep contaminated stormwater from reaching the lake

  • n.

    * Require plans for a proposed project within watershed subject to city approval to be submitted to EWD for comments

  • o.

    * Prohibit plowing of snow into lake and tributaries

  • p.

    Require all earth-moving contractors doing work in the watershed to be certified in NPS pollution mitigation

  • q.

    * Require all foundation work within areas subject to Shoreland Zoning to meet DEP standard for perimeter drainage

  • r.

    * Require boat and fishing equipment inspections for plant removal at public boat launches

  • s.

    * Prohibit new or expanded high impact uses

  • t.

    Prohibit landing of aircraft in the R3 zone

Document info
Document views133
Page views133
Page last viewedFri Dec 02 20:35:00 UTC 2016
Pages66
Paragraphs2177
Words20120

Comments