Uncrating the Unit

WARNING: Thermo King requires a 3 point lifting bar to safely lift and install units. A lifting bar can be made from the drawings provided.

WARNING: Eyebolts must be forged steel and minimum M12 (1/2 in.) diameter.

WARNING: Use only locking hooks to attach to the eyebolts (Detail A) to prevent damage to the unit or possible personal injury.

WARNING: The attaching point shown in Detail B, below, is not a major lifting point. It is used only to help maintain the unit in a level position during installation (Detail B).

  • 1.

    Carefully remove the top, sides and front crate members. Remove the top screen (if equipped).

  • 2.

    Remove the bottom panel.

  • 3.

    Install two lifting eyebolts into the holes at the rear frame rails, install nuts, and tighten securely.

  • 4.

    Attach the three point lifting bar securely to each of the three eyebolts and slightly raise the unit.

  • 5.

    Remove the base of the crate by removing the eight skid bracket screws (Detail C).

  • 6.

    Remove the two rear members of the crate and lift unit up from base approximately 304.8 mm (12.0 in.) (Detail C).

  • 7.

    Remove the four mounting bolts securing the two upright members to the unit (Detail C). Unit is now ready to install.